Skip to product information
1 of 3

Moakz

The Critical Path

The Critical Path

Regular price £20.00
Regular price Sale price £20.00
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
View full details

Release details

Artist Moakz
Cat. number CODELPV001
Format 2xVinyl
Country UK
Released 2025
Media condition Mint (M)
Sleeve condition Mint (M)
Styles Drum n Bass
What do the condition grades mean?
Mint (M) — absolutely perfect, never played.
Near Mint (NM or M-) — nearly perfect, no obvious signs of wear.
Very Good Plus (VG+) — light signs of use; faint surface noise possible on quiet passages.
Very Good (VG) — noticeable surface noise and light scuffs, but plays through without skipping.
Good (G) / Fair (F) / Poor (P) — plays, but with significant wear or damage.
Generic — supplied in a plain company or white sleeve rather than a picture sleeve.

Grading follows the standard Discogs scale.

Tracklist


A1. Someday
A2. Frontiers
B1. Escape All Reality
B2. Neon Future
C1. Shadows
C2. All The Things
D1. We Become The Sun
D2. Finality




All product images shown are for illustration purposes only. The actual product may vary due to the condition of the current copy in stock.

Shipped worldwide from the UK, packed in stiffened board mailers. Records are graded by eye and by ear before listing. If anything arrives not as described, email mail@thehardstore.com and we will put it right.